新手上路
威望 点
金钱 Home币
贡献值 点
好评度 点
|
发表于 2009-3-2 12:38:11
|
显示全部楼层
ITE测试项目:
1.6.2 Input test
1.7.11 Marking durability test
2.1.1.1 Access to energized parts
2.1.1.5 Energy hazardous measurement
2.1.1.7 Capacitance discharge test
2.2 SELV reliability test
2.4.2 Limited current circuit measurements
2.5 Limited power sources measurement
2.6.3.4 Earthing test
2.9.2 Humidity test
2.10.2 Determination of working voltage; voltage Measurements test
2.10.3-4 Clearance and creepage distance measurements
2.10.5 Distance through insulation measurements
2.9.3, 2.10.5.2 Transformer/Insulation electric strength test
3.2.6, 4.2.1, 4.2.7 Strain relief test
4.1 Stability tests
4.2 Mechanical strength
4.3.6 Direct plug-in equipment
4.3.8 Battery overchange/discharge tests
4.3.13 Radiation
4.5 Heating (temperature) test
4.5.5 Ball pressure test
4.6.5 Barrier adhesive test
5.1 Touch current tes
5.2 Electric strength test
5.3 Fault condition tests
Annex C.2 Table of Transformer
4.6 Openings in enclosure |
|